Solution
As an alternative to the cable hose, the project managers examined various solutions, finally leading to the
triflex R energy chain. The 3D chain was developed specifically for robotic applications. Adding the
triflex RS universal module produced the perfect solution to the application's problems. The particularly compact universal module is mounted on the robot at existing fastening points and can also be used in tight installation spaces in combination with the triflex R chain. It ensures that power supply to the robot head is delivered reliably and without cable stress. The retraction module allows the universal module to retract the cables with every movement, keeping the working area free. Downtime was reduced by two thirds (from an average of 55 malfunctions per week to 7.5). And instead of 55 minutes of maintenance per week, an average of only 7-11 minutes were required. Even if there is a major problem, maintenance is greatly simplified due to the modular triflex design. The chain can be opened so that cables no longer have to be painstakingly removed at the ends for replacement.
The results were so satisfactory that the system is to be examined for use at other BIW plants.