Solution
The customer therefore decided in favour of a
guidefast system, which is modular and designed to make the installation of cable trays and energy chains on cranes as quick and easy as possible.
A guidefast guide trough of a defined size is simply attached to the side of the crane using suitable brackets and fixed in place with clamping blocks. Welding the system to the crane is therefore completely unnecessary.
After we introduced the guidefast system, it is now the default on most of the company's double-girder cranes. The ease of installation alone has made it a preferred approach for Piedmont and customers are impressed with its sleek look. The photos show one of the cranes from Piedmont, which is now used for customer demonstrations.