Solution
In close co-operation with the customer, a solution was found to implement both applications, i.e. the cable guidance for the wind tunnel balance and the EMC test rig, with one basic mechanical system. Today, the cables are guided in three
energy chains with reverse bend radius (RBR) of
E4/4 (Series 5050), which are used in different lengths and with different interior separations. The rotating energy supply systems travel in guide troughs and can now achieve a rotation angle of up to 540° in one plane in a minimum of installation space. The basic mechanical structure was designed so flexibly in terms of adjustment options in a collaborative effort that about 140 assembly hours were saved compared to previous projects. To achieve the compact design, chainflex cables were also used for the power cables.