×
E4/00 system assembly instructions
Joining energy chains
Lay the inner links next to each other and fit the outer links.
Install the crossbars - press and lever them in with a screwdriver.
Mount the clip - for energy chains with crossbars every second link - press and lever it in.
Disassembling energy chains
Disassembling crossbars - position the screwdriver and pry them open.
Insert the screwdriver into the groove on the side link and release it by levering it out.
Remove the outer links by moving them to the side and separate the chain links.
Separating and joining energy tubes
Separating
Remove the lid/bottom.
Separating
Position the screwdriver and pry them open.
Joining
Mount lids/bottoms - attach them at an angle and snap them into place.